Jinnuoda’s Climate-Controlled Warehouse is a Constant Temperature Facility for pharmaceutical logistics, food processing, electronics, wine, and other high-value temperature-sensitive inventory. The Prefabricated Thermal Building combines Q355D structural steel, low-temperature impact properties, 150mm PIR panels, air-seal dock interfaces, and super-flat floor coordination. The steel package can be planned around thermal zones, refrigeration equipment, storage loads, logistics flow, and local weather criteria. This provides owners and EPC teams with a defined basis for reviewing thermal infrastructure, structural work, and site installation requirements together.
Jinnuoda’s Climate-Controlled Warehouse is a Constant Temperature Facility for goods that require planned control of temperature, humidity, handling access, and thermal continuity. The Prefabricated Thermal Building uses Q355D primary steel, 150mm PIR panels, galvanized secondary members, full-bolt connections, and a documented sealing approach. Rather than treating the enclosure as a simple layer around a steel frame, Jinnuoda coordinates the structure around refrigeration supports, air-seal docks, floor interfaces, rack loads, service access, and local wind or snow conditions. This makes the Climate-Controlled Warehouse a defined project scope for the owner, engineer, and construction team to evaluate and execute collaboratively.
Q355D structural steel is specified for the primary columns and rafters where the project design requires low-temperature impact properties. Its use in a Climate-Controlled Warehouse should be confirmed against the approved load schedule, operating temperatures, local code, and equipment requirements. The stated -20°C impact property helps project teams review material selection for sub-zero or fluctuating conditions. Final member sizes, bracing, and connections remain project-specific, especially where the Constant Temperature Facility includes high-bay storage, mezzanines, or roof-mounted refrigeration equipment.
The specified 150mm PIR sandwich panels support the thermal-envelope strategy of a Prefabricated Thermal Building. Concealed-fastener panel design, gasketed interfaces, insulated covers, vapor control, dock shelters, and door seals must all be coordinated with the thermal design. Jinnuoda can identify structural interfaces for roof penetrations, refrigeration services, and loading openings before fabrication. This helps the Constant Temperature Facility team evaluate the enclosure as a system instead of treating panels, steelwork, and dock equipment as unrelated packages.
The Climate-Controlled Warehouse can be coordinated with FM1 or FM2 floor criteria when supplied by the civil and racking teams. This is relevant to VNA racks, AGV routes, high-bay storage, and material-handling operations. Pre-tensioned Grade 10.9S bolt connections allow prepared members to be assembled without routine site welding. Tekla-based detailing can identify member marks, base plates, roof supports, dock interfaces, and access requirements before dispatch.
| Feature | Detailed Specification |
|---|---|
| Material Grade | Primary: Q355D High-Strength Steel (Yield Strength ≥ 355 MPa) |
| Impact Property | Guaranteed Ductility at -20°C (Impact Energy ≥ 27J) |
| Secondary Frame | G90 (Z275) High-Zinc Hot-Dip Galvanized Purlins & Girts |
| Coating System | Sa 2.5 Shot Blasting + Multi-layer System (Total DFT ≥ 150μm) |
| Enclosure System | 150mm PIR Sandwich Panels (High R-Value / B1 Fire Rated) |
| Sealing Standard | High-Airtightness Gasketed Nodes / Air-seal Dock Shelters |
| Floor Interface | FM1 / FM2 Super-flat Floor Compatibility |
| Execution Class | EN 1090-2 EXC3 (Highest B2B Standard) |
| Welding Quality | ISO 3834-2 Certified / IWE Supervision / 100% NDT Testing |
| Compliance Pack | CE Marked / ISO 9001 / WPS & WPQR Documented |
| Service Life | ≥ 50 Years (Operational Asset Performance) |
A constant-temperature project depends on coordinated steelwork, enclosure design, dock systems, refrigeration supports, floor loads, racking, and service access. Jinnuoda can provide Tekla shop drawings, material records, WPS and WPQR documentation, NDT scope, and IWE supervision where included in the contract. This documentation gives the owner a clearer method for reviewing the boundary between structural steel, refrigeration, civil work, and process equipment.
For procurement planning, useful inputs include site location, building dimensions, target temperature and humidity ranges, dock count, doors, rack loads, refrigeration equipment, roof loads, mezzanines, and applicable codes. These details help Jinnuoda separate confirmed requirements from optional services and provide a Climate-Controlled Warehouse scope that buyers can compare transparently.
Jinnuoda’s Climate-Controlled Warehouse and Constant Temperature Facility solutions support four applications where thermal continuity, hygiene access, and storage coordination are important:
|
💊 Pharmaceutical Logistics Hubs
The Constant Temperature Facility can coordinate controlled inventory areas, rack loads, thermal envelope requirements, and documented structural interfaces.
|
🍽️ Industrial Food Processing
The Prefabricated Thermal Building can be planned around insulated panels, dock operations, and refrigeration equipment supplied for food-chain logistics.
|
|
🧩 Electronic Component Warehousing
The Climate-Controlled Warehouse can coordinate clean access routes, thermal zones, floor criteria, and equipment interfaces for sensitive inventory programs.
|
🍷 Regional Wine & Perishable Hubs
A Constant Temperature Facility can organize receiving, storage, staging, and dispatch around the owner’s thermal profile and logistics schedule.
|
| Q1: How can thermal bridges be addressed in a Climate-Controlled Warehouse? |
| The enclosure design can use durable high‑performance PIR panels, concealed fasteners, gasketed interfaces, insulated covers, and air‑seal dock components. Final details should be confirmed through the formally approved thermal and structural design documents. |
| Q2: Does the project support European structural compliance? |
| The stated compliance scope includes CE marking, EN 1090-2 EXC3, and ISO 3834-2. Final applicability and documentation depend on the contract and applicable local requirements. |
| Q3: Is the structure compatible with VNA racking and AGV automation? |
| Jinnuoda can coordinate the structural grid, FM1/FM2 floor criteria, roof supports, access zones, and load points with information supplied by the racking and automation teams. |
Jinnuoda’s Climate-Controlled Warehouse is a Constant Temperature Facility for pharmaceutical logistics, food processing, electronics, wine, and other high-value temperature-sensitive inventory. The Prefabricated Thermal Building combines Q355D structural steel, low-temperature impact properties, 150mm PIR panels, air-seal dock interfaces, and super-flat floor coordination. The steel package can be planned around thermal zones, refrigeration equipment, storage loads, logistics flow, and local weather criteria. This provides owners and EPC teams with a defined basis for reviewing thermal infrastructure, structural work, and site installation requirements together.